Project Description

  • Project : Fifth Industrial Square Upgrading Project (Sharjah) – PS 10B Storm Water Pumping Station & Rising Main from Sheikh Mohammed Bin Zayed Road to the Sea

  • Type : Infrastructure

  • Location : Sharjah-UAE

  • Client : Sharjah Municipality

  • Consultant : CH2M Hill -Halcrow International

The Project requires the construction of a new Pumping Station (PS10B) in Industrial Area 10 – Sharjah, along with a 1.8m diameter Rising Main to the Sea. PS10B will discharge storm water from a new drainage system which has been constructed to drain water from the E311 highway in the vicinity of the Fifth Industrial Square in Sharjha. Along the final part of the rising main route, from Industrial Area No. 07 to the sea, a second pipe (2.4m diamter) will be laid in parellel. This will serve as the discharge route from two future storm water pumping staions (Ps C and PS D), which form part of the southern storm water drainage system envisaged by the Sharjah Municipality\’s master plan for storm water drainage.